Re: Length of proposed curb wall-- Sepulveda East...
Subject: Re: Length of proposed curb wall- Sepulveda East side
From: Audrey Netsawang <audrey.netsawang@lacity.org>
Date: 03/23/2015 12:56 PM
To: Donald Duckworth <duckworth.donald@gmail.com>
CC: John Ruhlen <JRuhlen916@aol.com>, Dennis Wake
<Dennis.Wake@lacity.org>, Robert Gutierrez <robert.gutierrez@lacity.org>, Fred
Sutton <fred.sutton@lacity.org>
Great! We will proceed with the cost estimate accordingly.
Thank you,
Audrey
On Fri, Mar 13, 2015 at 7:47 AM, Donald Duckworth
< duckworth.donald@gmail.com > wrote:
Good Morning All...
John and I meet on-site and staked out (we had help) the areas where we think
slough curb is required. The total is right at 500'. You are correct, our previous
guess was 271'. We are having a construction cost estimate prepared based on
this new figure.
The stakes are layed out with black paint to the inside, ie where the curbs
would extend.
On Thu, Mar 12, 2015 at 3:39 PM, Audrey Netsawang
< audrev.netsawanq@lacitv.orq > wrote:
Hi Don and John,
Dennis and I made a site visit today. In the attachments, I took photos of
where the first stake starts and the last one ends. I measured the distance
between these two areas and came up with 580 LF. During our previous
discussion, I recalled that we discussed 170 or 270 If. So I just want to make
sure that this is correct before proceeding with the cost estimate. Also, we
will be providing a cost estimate for the construction of the curbwall and
related irrigation and landscape work.
Please confirm.
Thank you,
Audrey
Audrey Netsawang
Landscape Architect
Department of Public Works
l of 2
08/15/2018 10:05 AM
Re: Length of proposed curb wall- Sepulveda East...
Bureau of Street Services
Ph: 213.847.0901
Audrey Netsawang
Landscape Architect
Department of Public Works
Bureau of Street Services
Ph: 213.847.0901